Metra Capital Delivery and Engineering

Welcome to the Metra Capital Delivery and Engineering page. This page was created by the Capital Delivery and Engineering Departments to provide information for project team members, consultants, contractors, and more. From here, you can have instant access to critical project information such as documents, drawings, manuals, and other important data.

Consultant and Contractor Login

Metra provides a secure FTP server which consultants and contractors may use to obtain necessary files. Follow the link below and enter your Metra provided login information to access this area.

Enter Metra FTP Site

National Environmental Policy Act (NEPA) Guidelines

The Environmental Procedures Manual is a document that provides guidance and procedures for navigating environmental compliance required by Federal, State, and Local governments. The Manual includes five (5) chapters:

  • Chapter 1: Introduction
  • Chapter 2: Process for Updating this Manual
  • Chapter 3: Metropolitan Planning and Air Quality Conformity
  • Chapter 4: Mitigation Tracking Log
  • Chapter 5: Design Changes

Environmental Procedures Manual

Design

Design Manual

The Design Manual (DMAN) is a document that provides overall guidance to teams that are providing design services for Metra projects. The manual is divided into 19 chapters:

  • Chapter 1: Introduction
  • Chapter 2: Project Life Cycle – Design
  • Chapter 3: Designer Roles, Responsibilities, and Tools
  • Chapter 4: Track Geometry
  • Chapter 5: Clearances
  • Chapter 6: Civil and Drainage
  • Chapter 7: Bridges and Structures
  • Chapter 8: Stations and Parking
  • Chapter 9: Signals (under development)
  • Chapter 10: Communications
  • Chapter 11: Traction Power
  • Chapter 12: Overhead Contact System, OCS
  • Chapter 13: Stray Current and Corrosion Control
  • Chapter 14: Mechanical, Electrical, and Plumbing
  • Chapter 15: Shops and Yards
  • Chapter 16: Crew Facilities
  • Chapter 17: Vehicles
  • Chapter 18: System Safety and Security (under development)
  • Chapter 19: Cybersecurity (under development)

NOTE: The Stations and Parking chapter was previously a separate document and now is part of the Design Manual

Metra Design Manual

Design Notifications

The intent of the Design Notifications is to notify the design teams working for Metra of new information, directions, clarifications and any other information applying to Design-Bid-Build projects. The Design Notifications are issued as new information and the need to relay directions arises.  The Design Notifications are issued in between new versions of the Design Manual, and when new versions of the Design Manual are published, the applicable Design Notifications are intended to be incorporated.

2024

Station and Parking Guidelines

Station and Parking Design Checklists

Sign Program

*NOTE: Although the content may be useful, Sample Signage Plans require revision to match the latest revisions to the Station and Parking Design Guidelines and the Station Sign Program Specification.

Station Information

Construction

The Metra Construction Manual is a document that provides overall guidance to teams that are working on Metra construction projects.  The Construction Manual includes six (6) chapters:

  • Chapter 1: Introduction
  • Chapter 2: Project Life Cycle - Implementation
  • Chapter 3: Responsibility & Authority - Construction Phase
  • Chapter 4: Construction Documentation and Deliverables
  • Chapter 5: Lessons Learned
  • Chapter 6: Closeout

Metra Construction Manual

Permit, Utility, and Other Project Guidance

The New Metra Permitting and Utility Coordination Guidebook is coming soon! The Guidebook is intended to provide an overview of the permit and utility requirements for various outside agencies and utilities as they relate to Metra Capital Delivery projects.

Permit Guidance

Below are guidance documents and resources for Permitting as it relates to Metra projects. 

Utility Guidance

Below are guidance documents and resources for Utility Coordination as it relates to Metra projects.

Metra Utility Coordination Workflow-Design Phase

Metra Utility Coordination Infographic (Utility Protection vs. Utility Relocation)

Temporary Shoring

Metra provides the following guidelines for temporary shoring for projects within its right-of-way.

Quality

Third Party Contracts Quality Management Plan (TPCQMP)

The Metra Third Party Contracts Quality Management Plan (TPCQMP) is a document that provides overall guidance to teams that are working on Metra projects in planning, design or construction. The TPC shall review their Contract and Task Order with their Metra PM to determine which Revision of the TPCQMP will be applicable for the TPC’s contracted work.

Generally, Revision 01 of the TPCQMP is for contracts that are administered prior to November 1, 2022. Revision 02 of the TPCQMP is for contracts that are administered on or after November 1, 2022. 

Forms and Instructions

The forms, instructions, and samples of completed forms are located in this section.

Please note that for projects started previous to November 1, 2022, the TPCQMP designated forms may be used. For all projects started on or after November 1, 2022, the new Project Form (PF) designated forms shall be used.

Summary Table of PF Forms, Instructions, and Samples

NAMEREVFORMINSTRUCTIONSSAMPLES
Addenda Preparation Instructions (Instructions Only)01n/aPF-I-01n/a
Drawing Log01PF-F-02PF-I-02PF-S-02
Contract Modification Cost Worksheet01PF-F-03PF-I-03PF-S-03
Contract Modification T&M Form01PF-F-04PF-I-04PF-S-04
Contract Modification Log01PF-F-05PF-I-05PF-S-05
Correspondence Log01PF-F-06PF-I-06PF-S-06
Daily Report01PF-F-07PF-I-07PF-S-07
Disposition of Review Comments Log01PF-F-09PF-I-09PF-S-09
Equipment Calibration Log01PF-F-10PF-I-10PF-S-10
Inspection and Testing Log01PF-F-11PF-I-11PF-S-11
Meeting Attendance Sheet01PF-F-12PF-I-12PF-S-12
Meeting Minutes01PF-F-13PF-I-13PF-S-13
Design Progress Meeting Minutes01PF-F-13an/an/a
Construction Progress Meeting Minutes01PF-F-13bn/an/a
Design Kick-off Meeting Minutes01PF-F-13cn/an/a
Consultant Check-in Meeting Minutes01PF-F-13dn/an/a
CM Kick-off Meeting Minutes01PF-F-13en/an/a
Preconstruction Meeting Minutes01PF-F-13fn/an/a
Nonconformance Report00PF-F-14PF-I-14n/a
Nonconformance Log01PF-F-15PF-I-15PF-S-15
Project/Deliverables List01PF-F-16PF-I-16PF-S-16
Project File Naming Directory Structure (Instructions Only)00n/aPF-I-17n/a
Project Organization Chart (Instructions and Sample Only)00n/aPF-I-18PF-S-18
Request for Information (RFI)01PF-F-19PF-I-19PF-S-19
Request for Information (RFI) Log01PF-F-20PF-I-20PF-S-20
Request for Inspection of Material (RFIM)01PF-F-21PF-I-21PF-S-21
Request for Inspection of Material (RFIM) Log01PF-F-22PF-I-22PF-S-22
Request for Material Received (RFMR) - Signals01PF-F-23PF-I-23PF-S-23
Request for Material Received (RFMR) Log - Signals01PF-F-24PF-I-24PF-S-24
Record of Contractor Contract (ROCC)01PF-F-25PF-I-25PF-S-25
Record of Contractor Contract (ROCC) Log01PF-F-26PF-I-26PF-S-26
Schedule (Instructions and Sample Only)00n/aPF-I-27PF-S-27
Submittal Cover Sheet - Signals01PF-F-28PF-I-28PF-S-28
Submittal Log - Signals01PF-F-29PF-I-29PF-S-29
Submittal Log01PF-F-30PF-I-30PF-S-30
Training Log01PF-F-31PF-I-31PF-S-31
Transmittal Cover Sheet01PF-F-32PF-I-32PF-S-32
Design Variance Form01PF-F-33PF-I-33PF-S-33
Stakeholder Details Table (Form and Sample Only)02PF-F-34n/aPF-S-34
Stakeholder Register Communications Plan (Form Only)01PF-F-35n/an/a
Check-In Meeting Agenda (Form and Instructions Only)01PF-F-36PF-I-36n/a
Construction Manager Kick Off Meeting Agenda (Form and Instructions Only)01PF-F-37PF-I-37n/a
Contractor Pre-Con and Kick Off Meeting Agenda (Form Only)01PF-F-38PF-I-38n/a
Contractor Project Progress Meeting Agenda (Form Only)01PF-F-39n/an/a
Design Kick Off Meeting Agenda (Form and Instructions Only)01PF-F-40PF-I-40n/a
Consultant Quality Verification Statement (Instructions and Sample Only)00n/aPF-I-41PF-S-41
Design Progress Meeting Agenda (Form and Instructions Only)01PF-F-42PF-I-42n/a
Punch List Form00PF-F-43PF-I-43PF-S-43
Lessons Learned Report00PF-F-44PF-I-44PF-S-44
Contract Finalization Checklist00PF-F-45PF-I-45PF-S-45
Final Building Inspection Form00PF-F-47PF-I-47PF-S-47
Warranty Log00PF-F-49PF-I-49PF-S-49
Spare Parts Log00PF-F-50PF-I-50PF-S-50
Stakeholder Communications Log00PF-F-51n/aPF-S-51
Customer Experience Evaluation00PF-F-52PF-I-52n/a
Division of Labor Schedule00PF-F-53PF-I-53PF-S-53

 

Summary Table of TPCQMP Forms, Instructions, and Samples

NAMEREVFORMINSTRUCTIONSSAMPLES
Addenda Preparation Instructions (Instructions Only)00n/aTPCQMP-I-01n/a
Drawing Log00TPCQMP-F-02TPCQMP-I-02TPCQMP-S-02
Contract Modification Cost Modification Worksheet00TPCQMP-F-03TPCQMP-I-03TPCQMP-S-03
Contract Modification T&M Form00TPCQMP-F-04TPCQMP-I-04TPCQMP-S-04
Contract Modification Log00TPCQMP-F-05TPCQMP-I-05TPCQMP-S-05
Correspondence Log01TPCQMP-F-06TPCQMP-I-06TPCQMP-S-06
Daily Report00TPCQMP-F-07TPCQMP-I-07TPCQMP-S-07
Disposition of Review Comments Log00TPCQMP-F-09TPCQMP-I-09TPCQMP-S-09
Equipment Calibration Log00TPCQMP-F-10TPCQMP-I-10TPCQMP-S-10
Inspection and Testing Log00TPCQMP-F-11TPCQMP-I-11TPCQMP-S-11
Meeting Attendance Sheet00TPCQMP-F-12TPCQMP-I-12TPCQMP-S-12
Meeting Minutes00TPCQMP-F-13TPCQMP-I-13TPCQMP-S-13
Nonconformance Report00TPCQMP-F-14TPCQMP-I-14TPCQMP-S-14
Nonconformance Log00TPCQMP-F-15TPCQMP-I-15TPCQMP-S-15
Project/Deliverables List00TPCQMP-F-16TPCQMP-I-16TPCQMP-S-16
Project File Naming Directory Structure (Instructions Only)02n/aTPCQMP-I-17n/a
Project Organization Chart (Instructions and Sample Only)00n/aTPCQMP-I-18TPCQMP-S-18
Request for Information (RFI)00TPCQMP-F-19TPCQMP-I-19TPCQMP-S-19
Request for Information (RFI) Log00TPCQMP-F-20TPCQMP-I-20TPCQMP-S-20
Request for Inspection of Material (RFIM)00TPCQMP-F-21TPCQMP-I-21TPCQMP-S-21
Request for Inspection of Material (RFIM) Log00TPCQMP-F-22TPCQMP-I-22TPCQMP-S-22
Request for Material Received (RFMR) - Signals02TPCQMP-F-23TPCQMP-I-23TPCQMP-S-23
Request for Material Received (RFMR) - Signals Log00TPCQMP-F-24TPCQMP-I-24TPCQMP-S-24
Record of Contractor Contract (ROCC)00TPCQMP-F-25TPCQMP-I-25TPCQMP-S-25
Record of Contractor Contract (ROCC) Log00TPCQMP-F-26TPCQMP-I-26TPCQMP-S-26
Schedule (Instructions and Sample only)00n/aTPCQMP-I-27TPCQMP-S-27
Submittal Cover Sheet - Signals00TPCQMP-F-28TPCQMP-I-28TPCQMP-S-28
Submittal Log - Signals00TPCQMP-F-29TPCQMP-I-29TPCQMP-S-29
Submittal Log00TPCQMP-F-30TPCQMP-I-30TPCQMP-S-30
Training Log00TPCQMP-F-31TPCQMP-I-31TPCQMP-S-31
Transmittal Cover Sheet00TPCQMP-F-32TPCQMP-I-32TPCQMP-S-32

CADD Standards

CADD Standards

The Metra CADD Manual outlines CADD requirements for the preparation of drawings that would be used in the planning, design, construction, and maintenance of Metra facilities and infrastructure.  The manual includes eight (8) chapters:

  • Chapter 1: Introduction
  • Chapter 2: Drawing Format
  • Chapter 3: General
  • Chapter 4: Drawing Border, Cover Sheet, and Index
  • Chapter 5: Drafting Requirements
  • Chapter 6: CADD Resources
  • Chapter 7: Drawing Development, Revisions, and Guidelines
  • Chapter 8: Project Deliverables

Metra CADD Manual, Revision 04

Metra Border

Metra Cover

Signals

Stations and Parking

*NOTE: Although the content may be useful, Platform and Station Details require revision to match the latest revisions to the Station and Parking Design Guidelines and the Station Sign Program Specification.

Within this page you will find many useful links to external documents and web sites. 

Rail Carrier Websites

Federal Transit Agency

U.S. Army Corps of Engineers

Feedback

The Metra Manuals are intended to guide teams to the successful completion of Metra work. Metra welcomes your feedback on the manuals as you use them.

Please find the directions for how to provide feedback on the manuals here! The Metra team looks forward to your thoughts.