Welcome to the Metra Capital Delivery and Engineering page. This page was created by the Capital Delivery and Engineering Departments to provide information for project team members, consultants, contractors, and more. From here, you can have instant access to critical project information such as documents, drawings, manuals, and other important data.
Consultant and Contractor Login
Metra provides a secure FTP server which consultants and contractors may use to obtain necessary files. Follow the link below and enter your Metra provided login information to access this area.
National Environmental Policy Act (NEPA) Guidelines
The Environmental Procedures Manual is a document that provides guidance and procedures for navigating environmental compliance required by Federal, State, and Local governments. The Manual includes five (5) chapters:
- Chapter 1: Introduction
- Chapter 2: Process for Updating this Manual
- Chapter 3: Metropolitan Planning and Air Quality Conformity
- Chapter 4: Mitigation Tracking Log
- Chapter 5: Design Changes
Environmental Procedures Manual
Design
Design Manual
The Design Manual (DMAN) is a document that provides overall guidance to teams that are providing design services for Metra projects. The manual is divided into 19 chapters:
- Chapter 1: Introduction
- Chapter 2: Project Life Cycle – Design
- Chapter 3: Designer Roles, Responsibilities, and Tools
- Chapter 4: Track Geometry
- Chapter 5: Clearances
- Chapter 6: Civil and Drainage
- Chapter 7: Bridges and Structures
- Chapter 8: Stations and Parking
- Chapter 9: Signals (under development)
- Chapter 10: Communications
- Chapter 11: Traction Power
- Chapter 12: Overhead Contact System, OCS
- Chapter 13: Stray Current and Corrosion Control
- Chapter 14: Mechanical, Electrical, and Plumbing
- Chapter 15: Shops and Yards
- Chapter 16: Crew Facilities
- Chapter 17: Vehicles
- Chapter 18: System Safety and Security (under development)
- Chapter 19: Cybersecurity (under development)
NOTE: The Stations and Parking chapter was previously a separate document and now is part of the Design Manual
Design Notifications
The intent of the Design Notifications is to notify the design teams working for Metra of new information, directions, clarifications and any other information applying to Design-Bid-Build projects. The Design Notifications are issued as new information and the need to relay directions arises. The Design Notifications are issued in between new versions of the Design Manual, and when new versions of the Design Manual are published, the applicable Design Notifications are intended to be incorporated.
2024
Station and Parking Guidelines
Station and Parking Design Checklists
- Station Design Checklists (Revised 11/22)
- Station Design Checklist Sample
- Parking Design Checklist, Revised 10/17
Sign Program
*NOTE: Although the content may be useful, Sample Signage Plans require revision to match the latest revisions to the Station and Parking Design Guidelines and the Station Sign Program Specification.
Station Information
- Metra Electric Main
- Metra Electric South Chicago
- Metra Heritage Corridor
- Metra North Central Service
- Metra Rock Island District Beverly Hills
- Metra Rock Island District Main
- Metra Southwest Service
- Milwaukee District North
- Milwaukee District West
- NICTD South Shore Branch
- Metra Union Pacific North
- Metra Union Pacific West
- Metra Union Pacific Northwest
- BNSF Map
- Metra Electric Blue Island
Construction
The Metra Construction Manual is a document that provides overall guidance to teams that are working on Metra construction projects. The Construction Manual includes six (6) chapters:
- Chapter 1: Introduction
- Chapter 2: Project Life Cycle - Implementation
- Chapter 3: Responsibility & Authority - Construction Phase
- Chapter 4: Construction Documentation and Deliverables
- Chapter 5: Lessons Learned
- Chapter 6: Closeout
Permit, Utility, and Other Project Guidance
The New Metra Permitting and Utility Coordination Guidebook is coming soon! The Guidebook is intended to provide an overview of the permit and utility requirements for various outside agencies and utilities as they relate to Metra Capital Delivery projects.
Permit Guidance
Below are guidance documents and resources for Permitting as it relates to Metra projects.
- Metra Permitting Workflow-Design Phase
- Metra Permit Matrix Process Infographic
- Metra Permit Matrix Template
- Metra Joint Application Permit Guide (Waterway Permitting)
- Metra National Pollutant Discharge Elimination System (NPDES) Permit Guide
- Metra System Map Suburban Permit Guide
- Metra System Permit Database
Utility Guidance
Below are guidance documents and resources for Utility Coordination as it relates to Metra projects.
Metra Utility Coordination Workflow-Design Phase
Metra Utility Coordination Infographic (Utility Protection vs. Utility Relocation)
Temporary Shoring
Metra provides the following guidelines for temporary shoring for projects within its right-of-way.
Quality
Third Party Contracts Quality Management Plan (TPCQMP)
The Metra Third Party Contracts Quality Management Plan (TPCQMP) is a document that provides overall guidance to teams that are working on Metra projects in planning, design or construction. The TPC shall review their Contract and Task Order with their Metra PM to determine which Revision of the TPCQMP will be applicable for the TPC’s contracted work.
Generally, Revision 01 of the TPCQMP is for contracts that are administered prior to November 1, 2022. Revision 02 of the TPCQMP is for contracts that are administered on or after November 1, 2022.
Forms and Instructions
The forms, instructions, and samples of completed forms are located in this section.
Please note that for projects started previous to November 1, 2022, the TPCQMP designated forms may be used. For all projects started on or after November 1, 2022, the new Project Form (PF) designated forms shall be used.
Summary Table of PF Forms, Instructions, and Samples
NAME | REV | FORM | INSTRUCTIONS | SAMPLES |
---|---|---|---|---|
Addenda Preparation Instructions (Instructions Only) | 01 | n/a | PF-I-01 | n/a |
Drawing Log | 01 | PF-F-02 | PF-I-02 | PF-S-02 |
Contract Modification Cost Worksheet | 01 | PF-F-03 | PF-I-03 | PF-S-03 |
Contract Modification T&M Form | 01 | PF-F-04 | PF-I-04 | PF-S-04 |
Contract Modification Log | 01 | PF-F-05 | PF-I-05 | PF-S-05 |
Correspondence Log | 01 | PF-F-06 | PF-I-06 | PF-S-06 |
Daily Report | 01 | PF-F-07 | PF-I-07 | PF-S-07 |
Disposition of Review Comments Log | 01 | PF-F-09 | PF-I-09 | PF-S-09 |
Equipment Calibration Log | 01 | PF-F-10 | PF-I-10 | PF-S-10 |
Inspection and Testing Log | 01 | PF-F-11 | PF-I-11 | PF-S-11 |
Meeting Attendance Sheet | 01 | PF-F-12 | PF-I-12 | PF-S-12 |
Meeting Minutes | 01 | PF-F-13 | PF-I-13 | PF-S-13 |
Design Progress Meeting Minutes | 01 | PF-F-13a | n/a | n/a |
Construction Progress Meeting Minutes | 01 | PF-F-13b | n/a | n/a |
Design Kick-off Meeting Minutes | 01 | PF-F-13c | n/a | n/a |
Consultant Check-in Meeting Minutes | 01 | PF-F-13d | n/a | n/a |
CM Kick-off Meeting Minutes | 01 | PF-F-13e | n/a | n/a |
Preconstruction Meeting Minutes | 01 | PF-F-13f | n/a | n/a |
Nonconformance Report | 00 | PF-F-14 | PF-I-14 | n/a |
Nonconformance Log | 01 | PF-F-15 | PF-I-15 | PF-S-15 |
Project/Deliverables List | 01 | PF-F-16 | PF-I-16 | PF-S-16 |
Project File Naming Directory Structure (Instructions Only) | 00 | n/a | PF-I-17 | n/a |
Project Organization Chart (Instructions and Sample Only) | 00 | n/a | PF-I-18 | PF-S-18 |
Request for Information (RFI) | 01 | PF-F-19 | PF-I-19 | PF-S-19 |
Request for Information (RFI) Log | 01 | PF-F-20 | PF-I-20 | PF-S-20 |
Request for Inspection of Material (RFIM) | 01 | PF-F-21 | PF-I-21 | PF-S-21 |
Request for Inspection of Material (RFIM) Log | 01 | PF-F-22 | PF-I-22 | PF-S-22 |
Request for Material Received (RFMR) - Signals | 01 | PF-F-23 | PF-I-23 | PF-S-23 |
Request for Material Received (RFMR) Log - Signals | 01 | PF-F-24 | PF-I-24 | PF-S-24 |
Record of Contractor Contract (ROCC) | 01 | PF-F-25 | PF-I-25 | PF-S-25 |
Record of Contractor Contract (ROCC) Log | 01 | PF-F-26 | PF-I-26 | PF-S-26 |
Schedule (Instructions and Sample Only) | 00 | n/a | PF-I-27 | PF-S-27 |
Submittal Cover Sheet - Signals | 01 | PF-F-28 | PF-I-28 | PF-S-28 |
Submittal Log - Signals | 01 | PF-F-29 | PF-I-29 | PF-S-29 |
Submittal Log | 01 | PF-F-30 | PF-I-30 | PF-S-30 |
Training Log | 01 | PF-F-31 | PF-I-31 | PF-S-31 |
Transmittal Cover Sheet | 01 | PF-F-32 | PF-I-32 | PF-S-32 |
Design Variance Form | 01 | PF-F-33 | PF-I-33 | PF-S-33 |
Stakeholder Details Table (Form and Sample Only) | 02 | PF-F-34 | n/a | PF-S-34 |
Stakeholder Register Communications Plan (Form Only) | 01 | PF-F-35 | n/a | n/a |
Check-In Meeting Agenda (Form and Instructions Only) | 01 | PF-F-36 | PF-I-36 | n/a |
Construction Manager Kick Off Meeting Agenda (Form and Instructions Only) | 01 | PF-F-37 | PF-I-37 | n/a |
Contractor Pre-Con and Kick Off Meeting Agenda (Form Only) | 01 | PF-F-38 | PF-I-38 | n/a |
Contractor Project Progress Meeting Agenda (Form Only) | 01 | PF-F-39 | n/a | n/a |
Design Kick Off Meeting Agenda (Form and Instructions Only) | 01 | PF-F-40 | PF-I-40 | n/a |
Consultant Quality Verification Statement (Instructions and Sample Only) | 00 | n/a | PF-I-41 | PF-S-41 |
Design Progress Meeting Agenda (Form and Instructions Only) | 01 | PF-F-42 | PF-I-42 | n/a |
Punch List Form | 00 | PF-F-43 | PF-I-43 | PF-S-43 |
Lessons Learned Report | 00 | PF-F-44 | PF-I-44 | PF-S-44 |
Contract Finalization Checklist | 00 | PF-F-45 | PF-I-45 | PF-S-45 |
Final Building Inspection Form | 00 | PF-F-47 | PF-I-47 | PF-S-47 |
Warranty Log | 00 | PF-F-49 | PF-I-49 | PF-S-49 |
Spare Parts Log | 00 | PF-F-50 | PF-I-50 | PF-S-50 |
Stakeholder Communications Log | 00 | PF-F-51 | n/a | PF-S-51 |
Customer Experience Evaluation | 00 | PF-F-52 | PF-I-52 | n/a |
Division of Labor Schedule | 00 | PF-F-53 | PF-I-53 | PF-S-53 |
Summary Table of TPCQMP Forms, Instructions, and Samples
NAME | REV | FORM | INSTRUCTIONS | SAMPLES |
---|---|---|---|---|
Addenda Preparation Instructions (Instructions Only) | 00 | n/a | TPCQMP-I-01 | n/a |
Drawing Log | 00 | TPCQMP-F-02 | TPCQMP-I-02 | TPCQMP-S-02 |
Contract Modification Cost Modification Worksheet | 00 | TPCQMP-F-03 | TPCQMP-I-03 | TPCQMP-S-03 |
Contract Modification T&M Form | 00 | TPCQMP-F-04 | TPCQMP-I-04 | TPCQMP-S-04 |
Contract Modification Log | 00 | TPCQMP-F-05 | TPCQMP-I-05 | TPCQMP-S-05 |
Correspondence Log | 01 | TPCQMP-F-06 | TPCQMP-I-06 | TPCQMP-S-06 |
Daily Report | 00 | TPCQMP-F-07 | TPCQMP-I-07 | TPCQMP-S-07 |
Disposition of Review Comments Log | 00 | TPCQMP-F-09 | TPCQMP-I-09 | TPCQMP-S-09 |
Equipment Calibration Log | 00 | TPCQMP-F-10 | TPCQMP-I-10 | TPCQMP-S-10 |
Inspection and Testing Log | 00 | TPCQMP-F-11 | TPCQMP-I-11 | TPCQMP-S-11 |
Meeting Attendance Sheet | 00 | TPCQMP-F-12 | TPCQMP-I-12 | TPCQMP-S-12 |
Meeting Minutes | 00 | TPCQMP-F-13 | TPCQMP-I-13 | TPCQMP-S-13 |
Nonconformance Report | 00 | TPCQMP-F-14 | TPCQMP-I-14 | TPCQMP-S-14 |
Nonconformance Log | 00 | TPCQMP-F-15 | TPCQMP-I-15 | TPCQMP-S-15 |
Project/Deliverables List | 00 | TPCQMP-F-16 | TPCQMP-I-16 | TPCQMP-S-16 |
Project File Naming Directory Structure (Instructions Only) | 02 | n/a | TPCQMP-I-17 | n/a |
Project Organization Chart (Instructions and Sample Only) | 00 | n/a | TPCQMP-I-18 | TPCQMP-S-18 |
Request for Information (RFI) | 00 | TPCQMP-F-19 | TPCQMP-I-19 | TPCQMP-S-19 |
Request for Information (RFI) Log | 00 | TPCQMP-F-20 | TPCQMP-I-20 | TPCQMP-S-20 |
Request for Inspection of Material (RFIM) | 00 | TPCQMP-F-21 | TPCQMP-I-21 | TPCQMP-S-21 |
Request for Inspection of Material (RFIM) Log | 00 | TPCQMP-F-22 | TPCQMP-I-22 | TPCQMP-S-22 |
Request for Material Received (RFMR) - Signals | 02 | TPCQMP-F-23 | TPCQMP-I-23 | TPCQMP-S-23 |
Request for Material Received (RFMR) - Signals Log | 00 | TPCQMP-F-24 | TPCQMP-I-24 | TPCQMP-S-24 |
Record of Contractor Contract (ROCC) | 00 | TPCQMP-F-25 | TPCQMP-I-25 | TPCQMP-S-25 |
Record of Contractor Contract (ROCC) Log | 00 | TPCQMP-F-26 | TPCQMP-I-26 | TPCQMP-S-26 |
Schedule (Instructions and Sample only) | 00 | n/a | TPCQMP-I-27 | TPCQMP-S-27 |
Submittal Cover Sheet - Signals | 00 | TPCQMP-F-28 | TPCQMP-I-28 | TPCQMP-S-28 |
Submittal Log - Signals | 00 | TPCQMP-F-29 | TPCQMP-I-29 | TPCQMP-S-29 |
Submittal Log | 00 | TPCQMP-F-30 | TPCQMP-I-30 | TPCQMP-S-30 |
Training Log | 00 | TPCQMP-F-31 | TPCQMP-I-31 | TPCQMP-S-31 |
Transmittal Cover Sheet | 00 | TPCQMP-F-32 | TPCQMP-I-32 | TPCQMP-S-32 |
CADD Standards
CADD Standards
The Metra CADD Manual outlines CADD requirements for the preparation of drawings that would be used in the planning, design, construction, and maintenance of Metra facilities and infrastructure. The manual includes eight (8) chapters:
- Chapter 1: Introduction
- Chapter 2: Drawing Format
- Chapter 3: General
- Chapter 4: Drawing Border, Cover Sheet, and Index
- Chapter 5: Drafting Requirements
- Chapter 6: CADD Resources
- Chapter 7: Drawing Development, Revisions, and Guidelines
- Chapter 8: Project Deliverables
Metra CADD Manual, Revision 04
Signals
Stations and Parking
*NOTE: Although the content may be useful, Platform and Station Details require revision to match the latest revisions to the Station and Parking Design Guidelines and the Station Sign Program Specification.
- CADD Manual, Revision 3, 8/18
- CADD Seed Files, 3/16
- Parking Details, Revised 10/17
- Platform Details, Revised 11/04 *
- Station Details, Revised 11/04 *
Links
Within this page you will find many useful links to external documents and web sites.
Rail Carrier Websites
- RTA Chicago - Regional Transit Authority
- Amtrak
- BNSF Railway
- Canadian National/Illinois Central Railroad
- Canadian Pacific Railway
- Norfolk Southern Railway
- Union Pacific Railroad
Federal Transit Agency
U.S. Army Corps of Engineers
Feedback
The Metra Manuals are intended to guide teams to the successful completion of Metra work. Metra welcomes your feedback on the manuals as you use them.
Please find the directions for how to provide feedback on the manuals here! The Metra team looks forward to your thoughts.